Wenzhou Longwan Haibing Welton Machinery Fittings Factory / 2022-06-23
=== Base Info ===
=== Description ===
17KWCabin systemWall panel 50mm EPS sandwich panel, steel sheet thickness: 0.6mmCeiling panel Galvanized steel sheet.Basement300mm depth, middle with grids, side with checkered plates. Rampthree pieces 2000*900mm rampsGlass4mm safety tempered glassWindowsSquare glass windows. Air Make-up SystemAir Inlet fan system1*7.5kw turbo fan, proof-explosion motor, Ex ratedExhausted fan system1*7.5kw turbo fan, proof-explosion motor, Ex rated Air capacity 25000m3/hAir Flowing speed0.3m/s in empty boothAir Control methodOne manual damper for air inlet and exhausted systemAir ducting8 meters air duct, one flop damper and one weather hoodPurification SystemPre-filterG3 grade, Pockets filter Ceiling filterEU5 / F5Floor filtergreen fiber glass filter / G3 gradeExhausted fan FiltersPocket filter or M green fiber glass filter and active carbonHeating SystemHeat ExchangerSUS304 material, argon arc welding.Heating burner: RG5S diesel oil burner(gas burner for option) Heating productivity 260000Kcal/hSpray to baking switchPneumatic Damper Chimney ducting3 meters stainless ducting and one chimney elbowMax heating temperature80degreesHeating time5-6min(20-60degrees)fuel consumption6-8L/vehicleLighting SystemCeiling lights8 Units, each 4 * 36W Philips lamps, Total 1152 WSide lights8 Units, each 4 *20W Philips lamps, Total 800 WIllumination 1000LUXControlling systemSwitched control panel Spraying & baking switch, lighting switch, emergency stop,
breakdown alarm, failure alarm, pressure gauge
Q: Which Port of loading?
A: Mainly ship from Ningbo port / Shanghai Port/Guangzhou Port.
Q: What is your MOQ?
A: All the products can be mixed in one container with low MOQ 1pcs.
Q: What is the Lead Time?
A: Normally it needs 20-25 days.
Q: What is the Payment Terms?
A: T/T/ 30% deposit before production and 70% before delivery.
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23