Fish Food Processing Machinery Food Extruder Machine

AIRMAX AL CO., LIMITED / 2022-07-05

Fish Food Processing Machinery Food Extruder Machine

  • Certification:CE, ISO9001, SGS
  • Power Source:Electric
  • Process:Thermal Processing
  • Automatic Grade:Automatic
  • Application:Ice Cream, Candy, Chocolate, Popcorn, Chips, Biscuit, Donut, Fish Pet
  • Customized:Customized

=== Base Info ===

  • Model NO.:KS Series
  • Transport Package:Wooden Case
  • Trademark:KS
  • Origin:Shandong, China
  • HS Code:8438800000
  • Production Capacity:50 Sets,Month

=== Description ===
ModelKS95KS90KS85KS70-1KS70KS65Installed Power100.7kw82.5kw92kw61.5kw46.5kw35kwMain Motor Power90kw75kw75kw45kw30kw22kwCapacity1500-2000kg/h800-1200kg/h400-500kg/h200-260kg/h200-260kg/h100-150kg/hDimension4.9×1.2×2.7m4.7×1.2×2.5m3.9×1.2×1.8m2.8×1.0×1.9m2.8×1.0×1.9m2.7×0.9×1.8m

6. Products Pictures

Fish Food Processing Machinery Food Extruder Machine
Fish Food Processing Machinery Food Extruder Machine


Pet Dog Fish Food Processing Equipment

7. Company: 

Pet Dog Fish Food Processing Equipment

Pet Dog Fish Food Processing Equipment

8. Our Valued Customer: 

Pet Dog Fish Food Processing Equipment

9. FAQ
1. Q: Are you a trading company or a manufacturer?
 A: We are the manufacturer, which has almost 10 years of experience in this industry.
 2. Q: How can I get to your company?
A: That's great you can visit our factory, welcome! You can get a flight to Jinan Airport. Our factories are just about 30 minutes drive away from Jinan Airport.We are so glad to arrange our car pick you up!
3. Q: How long is your guarantee?
 A: One year(Calculated from the equipment arrives the customer's side.)  After this period we will definitely support you when needed.
 You will be welcome to contact us with any problem may happened.
4. Q: Will you send engineers to install the plant?
A: yes, but at an extra cost payable by the customer.Or you can get local contractors to do the commissi      oning and we send one supervising engineer.

10. Our Service: 
Our engineer would go to buyer's place to install the machine, when the equipment arrived at buyer's place.
1). At least 1 year from the date of completion of the commissioning.
2). Free consultation service before, during, and after sales;
3). Free project planning and design services;
4). Free debugging of equipment until everything is functional;
5). Free management of equipments long distance shipping;
6). Free training of equipment maintenance and operating personally;
7). Free new production techniques and formulas;
8). Provide 1 year complete warranty and life-time maintenance service;
 
 



 

Copyright 2025 hkhuaqing.com All Rights Reserved

在线视频精品免费观看午夜影院在线免费观看亚洲成人性爱在线播放特级三级无码淫片视频亚洲大陆午夜福利看片色抖国内精品亚洲一区一区二区无码在线观看性爱视频久久精品视频日日夜夜青青草夜夜骑一区二区视频在线观看亚洲欧美精选激情视频亚洲激情视频在线观看