Ningbo Rena International Trade Co., Ltd. / 2022-07-04
=== Base Info ===
=== Description ===
Machine List for PVC Pipe Machine | Quantity |
1.Conical twin screw extruder (Equipped with automatic feeding unit) | One set |
2. Molds | One set |
3.Vacuum calibration unit | One set |
4.Haul-off unit | One set |
5.Cutter Unit | One set |
6.Stacker | One set |
Optional auxiliary machines for your choice | |
1.Printer | One set |
2.Mixer | One set |
3.Crusher | One set |
4.Milling machine | One set |
5.PVC pipe belling machine | One set |
PVC four pipes (4 in 1) extrusion line is made of a 65/132 conical twin screw extruder, one set of 4 in 1 mould, one set of calibration table , haul-off & cutting combination (dust free) and stacker.The diameter of the best production tube is from16mm to 32mm.Main features: high capacity, low power consumption, low water gas consumption, low occupation, low noise, low dust, etc.
type |
pipe diameter |
capacity |
Line speed |
machine length |
PVC-4 |
16-32mm |
5-6tons/day |
10m/min x4 |
18m |
Screw Diameter(mm) |
65/132 |
Main motor power (kw) |
37 |
The height of screw (mm) |
1000 |
Direction of screws |
Opposite outward ratation |
Total power(kw) |
100kw |
Weight (kg) |
4000 |
screw speed(r/min) |
1-37 |
max output(kg/h) |
250 |
boundary dimension(mm): |
4300×1500×2500 |
Effective length of the screw (mm) |
1460 |
Barrel heating section number |
4 |
Production line Length(m) | 18M |
structural style |
Cone mesh |
heating method |
casting aluminum heating |
Max speed m/min |
10m/min |
type | pipe diameter | max. output | max.line speed | machine length |
PVC-2-63 | 16-63mm | 250kg/h | 6m/min x2 | 21m |
PVC-2-110 | 75-110mm | 450kg/h | 7 m / min x2 | 23m |
type | pipe dia | extruder | max. output | max.line speed | machine length |
PVC-1-63 | 16-63mm | CTS51 | 180kg/h | 6m/min | 20m |
PVC-1-160 | 75-160mm | CTS65 | 250kg/h | 5 m/min | 23m |
PVC-1-400 | 200-400mm | CTS80 | 450kg/h | 4 m/min | 25m |
PVC-1-450 | 200-450mm | CTS92 | 650kg/h | 2 m/min | 30m |
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23